Covered Biogas Lagoon

ARG Biomass offer a gull design, build, project management and sourcing of all necessary components o build a covered biogas lagoon.

The heated, stirred, lined reactor system begins with a lined lagoon incorporating a double membrane gas storage system installed above the digestate level.

The digester is designed to act as a secondary storage to work alongside a primary digester to maximise retention time and recover all possible gas from the feedstock.

This system can be incorporated into all biogas sites, for example, on farm AD running on energy crop or food waste plants.  So this is suitable for animal waste, food waste and energy crops.

We offer a full design, build, project management and sourcing of all necessary components for a turn key system.  This can be retro-fitted onto an existing lined lagoon.

For more information, please contact us or call Rob on 07855 494467.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>